Likely plus ten. Likely enough?

Break the job into its parts and give each a range. The starting figures are a café fit-out; a software firm's booking system or an agency's rebrand works the same way, so swap in your own job.

Starting figures · add your ownThe job, in parts: days for each
The job
50Best case60Most likely95Worst case

Days in all. The runs average 68.

Pay and on-costs for one person's day, plus that day's share of the overheads. Not your day rate. What do we need to charge? works out the cost side.

Materials and bought-in (£)

Everything bought for the job: materials, kit hire, subcontractors, licences, print.

Your likely cost plus 10%. The fixed price you plan to quote, before VAT.

Somewhat linked, 30% of overruns paid back as agreed extras, priced to cover the cost in 8 runs in 10.

About 1 in 3
Runs that lose money at your price
£55,500
Price that covers the cost in 8 runs in 10, your likely cost plus 13%
What the runs sayOften loses

Half the runs cost under £52,258. One in ten costs more than £57,147. Your likely figures come to £49,000.

On the ranges you gave, a price of £53,900 loses money in about 1 in 3 runs. You would plan on £4,900 left; across the runs it averages £1,600, because the likely days add to 60 and the runs average 68. To cover the cost in 8 runs in 10 it needs £55,500, your likely cost plus 13%. Knowing the days on joinery would take £1,500 off that, more than 5% off materials (£1,200).

Which part to pin down

If one part came in at its likely days, or materials came in 5% cheaper
The partPrice for 8 in 10SavesLoses money at your price
As you gave them£55,500About 1 in 3
If joinery takes 18 days£54,000£1,500About 1 in 5
With 5% off materials£54,300£1,200About 1 in 4
If electrics and data takes 10 days£54,900£600About 1 in 4
If finishes takes 14 days£54,900£600About 1 in 4
If strip out takes 6 days£55,000£500About 1 in 3
If snagging and handover takes 7 days£55,100£400About 1 in 3
If survey and drawings takes 5 days£55,200£300About 1 in 3

Everything runs in your browser. Rough sums on the ranges you gave, before VAT, not a forecast and not financial advice. The ranges are your guesses, and the answer is only as good as they are. A price that covers the cost has no profit in it yet.

Downloads propellr-fixed-reminder.ics. Opens in Outlook, Google or Apple calendars. No sign-up, no email.

How this works

It prices the job 5,000 times. Each time, every part's days and the materials are picked from your best case to your worst case: most often near your likely figure, less often towards the ends, never outside them. The shape is a triangle, the same as What are the odds the cash runs short?.

Parts are linked. On Somewhat linked, a run where one part goes badly makes the others more likely to go badly too, as a tricky site or a slow client would. Whatever a part runs over its likely figure, the share you set comes back as agreed extras.

Each run's cost = days for each part × what a day costs you + materials − your share of the overruns paid back
Chance of a loss = runs costing more than your price ÷ 5,000

Your likely figures add to one cost. But each worst case sits further above the likely figure than the best case sits below it, so the runs average more than the likely cost. That gap is what a fixed price has to carry.

Which part to pin down runs the 5,000 again with one part held at its likely days, so you can see which part's range costs you most.

What to add to your likely cost to cover it in 8 runs in 10, by how lopsided each part's range is. Six equal parts, no materials, nothing paid back.
Each part's rangeEach on its ownSomewhat linkedMove together
10% either way1%2%3%
Down 10%, up 30%10%12%14%
Down 10%, up 60%22%26%29%
Down 20%, up 100%35%42%48%
Down 10%, up 150%59%68%77%

It leaves out VAT, payment terms and retentions, the cost of waiting for the money, penalties for finishing late, and anything you haven't thought of. Rough sums on the ranges you gave.

We did one like it

The money · Advise, then Run

More sales. Where's the profit?

A catering business with a fuller diary and no more profit. Counted properly, some of the biggest bookings left the least. Now there are minimum spends, and the team sees whether an event pays its way before agreeing the price.

Read the job
More on strategic finance

Profitable but short of cash?

Try next

Seen something familiar?

Rough sums only get you so far. Bring the real ones to a first call.

Book a callAsk about this result