Five clinics. One meaning of ready.
An owner-led group of five clinics, 85 staff. Each clinic ran its admin its own way, so head office couldn't see what was missing or compare one site with another.
The situation
Site spreadsheets, local checklists, shared inboxes and a roster for each clinic. Every one of them made sense to the people using it. Put five side by side and they stopped making sense.
The clinical system was never the problem, and it stayed exactly where it was. This was about everything round it: rooms ready on time, staffing gaps spotted early, admin passed on rather than dropped.
What we did. Week by week.
Advise, then Build, then Run. Sixteen weeks to live at all five sites, then six months of looking after it.
Weeks 1 to 3: agree what ready means
We map how each clinic gets rooms ready, raises a staffing gap and hands admin on. Then we agree one set of rules, and who can see, hand out and close each kind of task.
Weeks 4 to 8: build the two views
A view for site managers and one for head office, with reminders and a queue for the exceptions. The approved roster and the admin records are connected. Clinical records stay in their own system.
Weeks 9 to 12: one clinic first
We pilot at one clinic and check the data, the permissions and the rules there. Whatever the pilot shows up gets fixed before the other four see it.
Weeks 13 to 16: the other four, in stages
The other clinics come on one after another, with a champion at each site training the team locally. All five sites live by week 16.
The six months after: keep it working
We look after the workflows, train the people using them and make the improvements we agreed. By month 10, overdue admin is 7% of the 200 tasks due, down from 18%.
What we'd do differently
We'd have every site agree what ready and complete mean before we designed the dashboard at all. Five definitions make a very tidy report that quietly misleads.
Real job. Real figures.
The turning point
Ready and complete meant different things at different sites. A group dashboard built before that was settled would have compared unlike with unlike, very neatly. So the rules, and who owns them, came first.
What changed
Site managers work from one view, head office stops collecting reports, and the clinical record stays where it was.
Live across all five sites since week 16. We kept improving it to month 10, which is where these figures stop.
- Before: Each clinic tracks room readiness and admin its own wayAfter: One room-readiness and admin view for every site manager
- Before: Head office collects five separate reportsAfter: Head office sees staffing gaps and overdue actions directly
- Before: The same readiness details typed in three timesAfter: Typed in once
Week 1 against month 10. These are admin figures, not clinical outcomes, and we would not dress them up as anything else.
What it took
- 01
Time
Sixteen weeks for discovery, a pilot and the rollout. Then six months of support.
- 02
Who, on their side
Operations lead: two hours a week during the build. A champion at each site: pilot sessions every fortnight, then training the team locally.
- 03
How it was charged
A fixed price for the build and rollout. Then a monthly fee for looking after the system and the improvements we agreed.
Got a version of this?
This is operations work: find where the hours go, fix how the work flows, then build the tools that fit. In that order.
Two more, in fullCash in the group. Cash you can use.A trial visit. Then a membership.
Where are your hours going?
Walk us through a normal Tuesday. We'll find where the hours leak.
Book a Call